Skip to content
Amptech Pty Ltd — calibration services Perth
Workplace electrical safety · A separate service to calibration

Test & Tag in Perth

Fast, affordable inspection, testing and tagging of your electrical equipment to AS/NZS 3760 — keep your workplace safe, compliant and audit-ready. (This is a workplace safety service, not a calibration.)

Compliance made simple

Australian workplaces have a duty to keep portable electrical equipment safe. AmpTech inspects, tests and tags your equipment to AS/NZS 3760, applies a durable tag with the test and next-due dates, and gives you a full register for audits and insurance. We make compliance simple, affordable and easy to keep on top of.

PASSEDAS/NZS 3760
Why test & tag with AmpTech

Safe, compliant, hassle-free

Stay compliant

Meet your WHS duty of care and AS/NZS 3760 with documented, repeatable testing.

Affordable per-item pricing

Competitive rates with volume discounts — great value for sites with lots of equipment.

Full asset register

Every item logged with results, test date and due date — ready for audits and insurers.

Reminders & scheduling

We track due dates and remind you ahead of time, so re-tests can be booked before they fall due.

After-hours available

We can test outside business hours to avoid disrupting your operations.

One provider

Run your test & tag round and your calibration recalls through the same team, on one schedule.

What we test & tag

  • Portable power tools
  • Office & kitchen appliances
  • Extension leads & power boards
  • Battery chargers & adaptors
  • Site & workshop equipment
  • RCDs (safety switches)
  • New equipment (out-of-box)
  • Hire & loan equipment

Typical testing intervals

Recommended re-test frequencies to AS/NZS 3760. We'll confirm what applies to your site.

EnvironmentInterval
Building, construction & demolition sites3 months
Factories, workshops & warehouses6 months
Commercial cleaning equipment6 months
Hire equipment (inspection / test)3 / 12 months
Offices, shops & low-risk areas12 months
Where we test & tag

On site across the Perth metro area

Test & tag is performed at your premises. Pick your suburb for the workplaces we cover there, the AS/NZS 3760 intervals that apply, and how calibration pickup works on the same visit. Peel and South West rounds are available by arrangement.

Outside Perth?Calibration for regional WAexplains freight, and where test & tag is available by arrangement.

FAQ

Test & Tag FAQs

Is test and tag a legal requirement?
Under WHS law every employer has a duty to keep electrical equipment safe. AS/NZS 3760 is a standard rather than a law in itself, but it is the recognised way to meet that duty — and on construction and demolition sites, WHS regulations make testing and tagging of portable equipment a requirement.
How often does equipment need testing?
It depends on the environment — from every 3 months on construction sites to every 12 months in offices. We will confirm the correct interval for your workplace and remind you when re-tests are due.
What is included in a test and tag?
A visual inspection, an electrical safety test with a calibrated appliance tester, a durable tag showing the test and due dates, and an itemised register of results for your records.
Do you test RCDs (safety switches)?
Yes. We carry out push-button and trip-time testing of RCDs and include the results in your compliance register.
Can you test after hours?
Yes — we can work outside business hours or on weekends so testing does not interrupt your operations.
Related

Test & tag across industries & guides

Mining

Mining calibration in Perth

AmpTech supports Perth-based mining offices, workshops and FIFO bases with traceable calibration of the test and measurement equipment that keeps safety and production audits clean. Our reference standards are traceable to national standards and every calibration runs under our ISO 9001 certified quality management system.

Learn more
Construction

Calibration and test & tag for Perth construction

Construction sites in Perth have to keep portable electrical equipment safe and tested every three months under AS/NZS 3760 — and the multimeters and clamp meters used to commission services need to be calibrated. AmpTech handles both: test & tag on your site, calibration in our Caversham lab.

Learn more
Manufacturing

Manufacturing calibration in Perth

Perth manufacturers depend on accurate dimensional and temperature instruments to keep production within tolerance. AmpTech calibrates them against reference standards traceable to national standards and gives you the documentation a quality audit expects to see.

Learn more
Guide

AS/NZS 3760 test and tag intervals explained

AS/NZS 3760 is the standard that drives test and tag in Australian workplaces. Here is how the intervals are set, where 3 months is required vs where 12 months is enough, and how to keep a register the regulator will accept.

Learn more
Guide

Test and tag vs calibration: what is the difference?

These two terms get used interchangeably — and they should not be. One says the equipment is safe to plug in; the other says its readings are accurate. Here is the difference and how to plan both.

Learn more

Book your test & tag today

Keep your team safe and your site compliant. We'll run your test & tag round on site and can collect any instruments due for calibration while we're there.